H. B. 2803


(By Delegates Hubbard, Fleischauer,
Mahan, Perdue and Hatfield)


[Introduced February 17, 1999; referred to the


Committee on the Judiciary then Finance.]
A BILL to amend and reenact section thirteen, article three,
chapter twenty-two of the code of West Virginia, one
thousand nine hundred thirty-one, as amended, relating to
removing woodland, fish and wildlife and recreational lands
as proposed post-mining uses; defining "agricultural use"
and "public use"; specifying necessary proofs to support
proposed post-mining uses; and requiring that approved
post-mining land use must be achieved prior to release of
the performance bond.
Be it enacted by the Legislature of West Virginia:
That section thirteen, article three, chapter twenty-two of
the code of West Virginia, one thousand nine hundred thirty-one,
as amended, be amended and reenacted to read as follows:
ARTICLE 3. SURFACE COAL MINING AND RECLAMATION ACT.
§22-3-13. General environmental protection performance standards 







for surface-mining; variances.
(a) Any permit issued by the director pursuant to this
article to conduct surface-mining operations shall require that
the surface-mining operations will meet all applicable
performance standards of this article and other requirements as
the director promulgates.
(b) The following general performance standards are
applicable to all surface mines and require the operation, at a
minimum to:
(1) Maximize the utilization and conservation of the solid
fuel resource being recovered to minimize reaffecting the land in
the future through surface-mining;
(2) Restore the land affected to a condition capable of
supporting the uses which it was capable of supporting prior to
any mining, or higher or better uses of which there is reasonable
likelihood so long as the use or uses do not present any actual
or probable hazard to public health or safety or pose any actual
or probable threat of water diminution or pollution, and the
permit applicants' declared proposed land use following
reclamation is not deemed considered to be impractical or
unreasonable, inconsistent with applicable land use policies and
plans, involves unreasonable delay in implementation or is
violative of federal, state or local law;
(3) Except as provided in subsection (c) of this section,
with respect to all surface mines, backfill, compact where
advisable to ensure stability or to prevent leaching of toxic
materials and grade in order to restore the approximate original
contour: Provided, That in surface-mining which is carried out
at the same location over a substantial period of time where the
operation transects the coal deposit, and the thickness of the
coal deposits relative to the volume of the overburden is large
and where the operator demonstrates that the overburden and other
spoil and waste materials at a particular point in the permit
area or otherwise available from the entire permit area is
insufficient, giving due consideration to volumetric expansion,
to restore the approximate original contour, the operator, at a
minimum, shall backfill, grade and compact, where advisable,
using all available overburden and other spoil and waste
materials to attain the lowest practicable grade, but not more
than the angle of repose, to provide adequate drainage and to
cover all acid-forming and other toxic materials, in order to
achieve an ecologically sound land use compatible with the
surrounding region: Provided, however, That in surface-mining
where the volume of overburden is large relative to the thickness
of the coal deposit and where the operator demonstrates that due
to volumetric expansion the amount of overburden and other spoil and waste materials removed in the course of the mining operation
is more than sufficient to restore the approximate original
contour, the operator shall, after restoring the approximate
contour, backfill, grade and compact, where advisable, the excess
overburden and other spoil and waste materials to attain the
lowest grade, but not more than the angle of repose, and to cover
all acid-forming and other toxic materials, in order to achieve
an ecologically sound land use compatible with the surrounding
region and, the overburden or spoil shall be shaped and graded in
such a way as to prevent slides, erosion and water pollution and
is revegetated in accordance with the requirements of this
article: Provided further, That the director shall promulgate
rules governing variances to the requirements for return to
approximate original contour or highwall elimination and where
adequate material is not available from surface-mining operations
permitted after the effective date of this article for: (A)
Underground mining operations existing prior to the third day of
August, one thousand nine hundred seventy-seven; or (B) for
areas upon which surface-mining prior to the first day of July,
one thousand nine hundred seventy-seven, created highwalls;
(4) Stabilize and protect all surface areas, including spoil
piles, affected by the surface-mining operation to effectively
control erosion and attendant air and water pollution;
(5) Remove the topsoil from the land in a separate layer,
replace it on the backfill area, or if not utilized immediately,
segregate it in a separate pile from other spoil and, when the
topsoil is not replaced on a backfill area within a time short
enough to avoid deterioration of the topsoil, maintain a
successful vegetative cover by quick growing plants or by other
similar means in order to protect topsoil from wind and water
erosion and keep it free of any contamination by other acid or
toxic material: Provided, That if topsoil is of insufficient
quantity or of poor quality for sustaining vegetation, or if
other strata can be shown to be more suitable for vegetation
requirements, then the operator shall remove, segregate and
preserve in a like manner such other strata which is best able to
support vegetation;
(6) Restore the topsoil or the best available subsoil which
is best able to support vegetation;
(7) Ensure that all prime farmlands are mined and reclaimed
in accordance with the specifications for soil removal, storage,
replacement and reconstruction established by the United States
secretary of agriculture and the soil conservation service
pertaining thereto. The operator, at a minimum, shall be
required to: (A) Segregate the A horizon of the natural soil,
except where it can be shown that other available soil materials will create a final soil having a greater productive capacity,
and if not utilized immediately, stockpile this material
separately from other spoil, and provide needed protection from
wind and water erosion or contamination by other acid or toxic
material; (B) segregate the B horizon of the natural soil, or
underlying C horizons or other strata, or a combination of such
horizons or other strata that are shown to be both texturally and
chemically suitable for plant growth and that can be shown to be
equally or more favorable for plant growth than the B horizon, in
sufficient quantities to create in the regraded final soil a root
zone of comparable depth and quality to that which existed in the
natural soil, and if not utilized immediately, stockpile this
material separately from other spoil and provide needed
protection from wind and water erosion or contamination by other
acid or toxic material; (C) replace and regrade the root zone
material described in subparagraph (B) above with proper
compaction and uniform depth over the regraded spoil material;
and (D) redistribute and grade in a uniform manner the surface
soil horizon described in subparagraph (A) above;
(8) Create, if authorized in the approved surface-mining and
reclamation plan and permit, permanent impoundments of water on
mining sites as part of reclamation activities in accordance with
rules promulgated by the director;
(9) Where augering is the method of recovery, seal all auger
holes with an impervious and noncombustible material in order to
prevent drainage except where the director determines that the
resulting impoundment of water in such auger holes may create a
hazard to the environment or the public welfare and safety:
Provided, That the director may prohibit augering if necessary to
maximize the utilization, recoverability or conservation of the
mineral resources or to protect against adverse water quality
impacts;
(10) Minimize the disturbances to the prevailing hydrologic
balance at the mine site and in associated off-site areas and to
the quality and quantity of water in surface and groundwater
systems both during and after surface-mining operations and
during reclamation by: (A) Avoiding acid or other toxic mine
drainage by such measures as, but not limited to: (i) Preventing
or removing water from contact with toxic producing deposits;
(ii) treating drainage to reduce toxic content which adversely
affects downstream water upon being released to water courses;
and (iii) casing, sealing or otherwise managing boreholes, shafts
and wells and keep acid or other toxic drainage from entering
ground and surface waters; (B) conducting surface-mining
operations so as to prevent to the extent possible, using the
best technology currently available, additional contributions of suspended solids to streamflow or runoff outside the permit area,
but in no event shall contributions be in excess of requirements
set by applicable state or federal law; (C) constructing an
approved drainage system pursuant to subparagraph (B) of this
subdivision prior to commencement of surface-mining operations,
such the system to be certified by a person approved by the
director to be constructed as designed and as approved in the
reclamation plan; (D) avoiding channel deepening or enlargement
in operations requiring the discharge of water from mines; (E)
unless otherwise authorized by the director, cleaning out and
removing temporary or large settling ponds or other siltation
structures after disturbed areas are revegetated and stabilized,
and depositing the silt and debris at a site and in a manner
approved by the director; (F) restoring recharge capacity of the
mined area to approximate premining conditions; and (G) such
other actions as the director may prescribe;
(11) With respect to surface disposal of mine wastes,
tailings, coal processing wastes and other wastes in areas other
than the mine working excavations, stabilize all waste piles in
designated areas through construction in compacted layers,
including the use of noncombustible and impervious materials if
necessary, and assure the final contour of the waste pile will be
compatible with natural surroundings and that the site will be stabilized and revegetated according to the provisions of this
article;
(12) Design, locate, construct, operate, maintain, enlarge,
modify and remove or abandon, in accordance with standards and
criteria developed pursuant to subsection (f) of this section,
all existing and new coal mine waste piles consisting of mine
wastes, tailings, coal processing wastes or other liquid and
solid wastes, and used either temporarily or permanently as dams
or embankments;
(13) Refrain from surface-mining within five hundred feet of
any active and abandoned underground mines in order to prevent
breakthroughs and to protect health or safety of miners:
Provided, That the director shall permit an operator to mine
near, through or partially through an abandoned underground mine
or closer to an active underground mine if: (A) The nature,
timing and sequencing of the approximate coincidence of specific
surface mine activities with specific underground mine activities
are coordinated jointly by the operators involved and approved by
the director; and (B) such operations will result in improved
resource recovery, abatement of water pollution or elimination of
hazards to the health and safety of the public: Provided,
however, That any breakthrough which does occur shall be sealed;
(14) Ensure that all debris, acid-forming materials, toxic materials or materials constituting a fire hazard are treated or
buried and compacted, or otherwise disposed of in a manner
designed to prevent contamination of ground or surface waters,
and that contingency plans are developed to prevent sustained
combustion: Provided, That the operator shall remove or bury all
metal, lumber, equipment and other debris resulting from the
operation before grading release;
(15) Ensure that explosives are used only in accordance with
existing state and federal law and the rules promulgated by the
director, which shall include provisions to: (A) Provide
adequate advance written notice to local governments and
residents who might be affected by the use of the explosives by
publication of the planned blasting schedule in a newspaper of
general circulation in the locality and by mailing a copy of the
proposed blasting schedule to every resident living within one-
half mile of the proposed blasting site: Provided, That this
notice shall suffice as daily notice to residents or occupants of
the areas; (B) maintain for a period of at least three years and
make available for public inspection, upon written request, a log
detailing the location of the blasts, the pattern and depth of
the drill holes, the amount of explosives used per hole and the
order and length of delay in the blasts; (C) limit the type of
explosives and detonating equipment, the size, the timing and frequency of blasts based upon the physical conditions of the
site so as to prevent: (i) Injury to persons; (ii) damage to
public and private property outside the permit area; (iii)
adverse impacts on any underground mine; and (iv) change in the
course, channel or availability of ground or surface water
outside the permit area; (D) require that all blasting operations
be conducted by persons certified by the director; and (E)
provide that upon written request of a resident or owner of a
man-made dwelling or structure within one-half mile of any
portion of the permit area, the applicant or permittee shall
conduct a preblasting survey or other appropriate investigation
of the structures and submit the results to the director and a
copy to the resident or owner making the request. The area of
the survey shall be determined by the director in accordance with
rules promulgated by him or her;
(16) Ensure that all reclamation efforts proceed in an
environmentally sound manner and as contemporaneously as
practicable with the surface-mining operations. Time limits
shall be established by the director requiring backfilling,
grading and planting to be kept current: Provided, That where
surface-mining operations and underground mining operations are
proposed on the same area, which operations must be conducted
under separate permits, the director may grant a variance from the requirement that reclamation efforts proceed as
contemporaneously as practicable to permit underground mining
operations prior to reclamation:
(A) If the director finds in writing that:
(i) The applicant has presented, as part of the permit
application, specific, feasible plans for the proposed
underground mining operations;
(ii) The proposed underground mining operations are
necessary or desirable to assure maximum practical recovery of
the mineral resource and will avoid multiple disturbance of the
surface;
(iii) The applicant has satisfactorily demonstrated that the
plan for the underground mining operations conforms to
requirements for underground mining in the jurisdiction and that
permits necessary for the underground mining operations have been
issued by the appropriate authority;
(iv) The areas proposed for the variance have been shown by
the applicant to be necessary for the implementing of the
proposed underground mining operations;
(v) No substantial adverse environmental damage, either
on-site or off-site, will result from the delay in completion of
reclamation as required by this article; and
(vi) Provisions for the off-site storage of spoil will comply with subdivision (22), subsection (b) of this section;
(B) If the director has promulgated specific rules to govern
the granting of such variances in accordance with the provisions
of this subparagraph and has imposed such additional requirements
as the director deems considers necessary;
(C) If variances granted under the provisions of this
paragraph are reviewed by the director not more than three years
from the date of issuance of the permit: Provided, That the
underground mining permit shall terminate if the underground
operations have not commenced within three years of the date the
permit was issued, unless extended as set forth in subdivision
(3), section eight of this article; and
(D) If liability under the bond filed by the applicant with
the director pursuant to subsection (b), section eleven of this
article is for the duration of the underground mining operations
and until the requirements of subsection (g), section eleven and
section twenty-three of this article have been fully complied
with;
(17) Ensure that the construction, maintenance and post-
mining conditions of access and haulroads into and across the
site of operations will control or prevent erosion and siltation,
pollution of water, damage to fish or wildlife or their habitat,
or public or private property: Provided, That access roads constructed for and used to provide infrequent service to surface
facilities, such as ventilators or monitoring devices, are exempt
from specific construction criteria provided adequate
stabilization to control erosion is achieved through alternative
measures;
(18) Refrain from the construction of roads or other access
ways up a stream bed or drainage channel or in proximity to the
channel so as to significantly alter the normal flow of water;
(19) Establish on the regraded areas, and all other lands
affected, a diverse, effective and permanent vegetative cover of
the same seasonal variety native to the area of land to be
affected or of a fruit, grape or berry producing variety suitable
for human consumption and capable of self-regeneration and plant
succession at least equal in extent of cover to the natural
vegetation of the area, except that introduced species may be
used in the revegetation process where desirable or when
necessary to achieve the approved post-mining land use plan;
(20) Assume the responsibility for successful revegetation,
as required by subdivision (19) of this subsection, for a period
of not less than five growing seasons, as defined by the
director, after the last year of augmented seeding, fertilizing,
irrigation or other work in order to assure compliance with
subdivision (19) of this subsection: Provided, That when the director issues a written finding approving a long-term
agricultural post-mining land use as a part of the mining and
reclamation plan, the director may grant exception to the
provisions of subdivision (19) of this subsection: Provided,
however, That when the director approves an agricultural
post-mining land use, the applicable five growing seasons of
responsibility for revegetation begins on the date of initial
planting for such agricultural post-mining land use;
On lands eligible for remining assume the responsibility for
successful revegetation, as required by subdivision (19) of this
subsection, for a period of not less than two growing seasons, as
defined by the director after the last year of augmented seeding,
fertilizing, irrigation or other work in order to assure
compliance with subdivision (19) of this subsection;
(21) Protect off-site areas from slides or damage occurring
during surface-mining operations and not deposit spoil material
or locate any part of the operations or waste accumulations
outside the permit area: Provided, That spoil material may be
placed outside the permit area, if approved by the director after
a finding that environmental benefits will result from such;
(22) Place all excess spoil material resulting from
surface-mining activities in such a manner that: (A) Spoil is
transported and placed in a controlled manner in position for concurrent compaction and in a way as to assure mass stability
and to prevent mass movement; (B) the areas of disposal are
within the bonded permit areas and all organic matter is removed
immediately prior to spoil placements; (C) appropriate surface
and internal drainage system or diversion ditches are used to
prevent spoil erosion and movement; (D) the disposal area does
not contain springs, natural water courses or wet weather seeps,
unless lateral drains are constructed from the wet areas to the
main underdrains in a manner that filtration of the water into
the spoil pile will be prevented; (E) if placed on a slope, the
spoil is placed upon the most moderate slope among those upon
which, in the judgment of the director, the spoil could be placed
in compliance with all the requirements of this article, and is
placed, where possible, upon, or above, a natural terrace, bench
or berm, if placement provides additional stability and prevents
mass movement; (F) where the toe of the spoil rests on a
downslope, a rock toe buttress, of sufficient size to prevent
mass movement, is constructed; (G) the final configuration is
compatible with the natural drainage pattern and surroundings and
suitable for intended uses; (H) design of the spoil disposal area
is certified by a qualified registered professional engineer in
conformance with professional standards; and (I) all other
provisions of this article are met: Provided, That where the excess spoil material consists of at least eighty percent, by
volume, sandstone, limestone or other rocks that do not slake in
water and will not degrade to soil material, the director may
approve alternate methods for disposal of excess spoil material,
including fill placement by dumping in a single lift, on a site
specific basis: Provided, however, That the services of a
qualified registered professional engineer experienced in the
design and construction of earth and rockfill embankment are
utilized: Provided further, That such the approval may not be
unreasonably withheld if the site is suitable;
(23) Meet such other criteria as are necessary to achieve
reclamation in accordance with the purposes of this article,
taking into consideration the physical, climatological and other
characteristics of the site;
(24) To the extent possible, using the best technology
currently available, minimize disturbances and adverse impacts of
the operation on fish, wildlife and related environmental values,
and achieve enhancement of these resources where practicable; and
(25) Retain a natural barrier to inhibit slides and erosion
on permit areas where outcrop barriers are required: Provided,
That constructed barriers may be allowed where: (A) Natural
barriers do not provide adequate stability; (B) natural barriers
would result in potential future water quality deterioration; and (C) natural barriers would conflict with the goal of maximum
utilization of the mineral resource: Provided, however, That at
a minimum, the constructed barrier must be of sufficient width
and height to provide adequate stability and the stability factor
must equal or exceed that of the natural outcrop barrier:
Provided further, That where water quality is paramount, the
constructed barrier must be composed of impervious material with
controlled discharge points.
(c) (1) The director may prescribe procedures pursuant to
which he or she may permit surface-mining operations for the
purposes set forth in subdivision (3) of this subsection.
(2) Where an applicant meets the requirements of
subdivisions (3) and (4) of this subsection, a permit without
regard to the requirement to restore to approximate original
contour set forth in subsection (b) or (d) of this section may be
granted for the surface-mining of coal where the mining operation
will remove an entire coal seam or seams running through the
upper fraction of a mountain, ridge or hill, except as provided
in subparagraph (A), subdivision (4) of this subsection, by
removing all of the overburden and creating a level plateau or a
gently rolling contour with no highwalls remaining, and capable
of supporting post-mining uses in accordance with the
requirements of this subsection.
(3) In cases where an industrial, commercial, woodland,
agricultural, residential or public facility (including
recreational lands) or fish and wildlife habitat and recreation
lands use is proposed for the post-mining use of the affected
land, the director may grant a permit for a surface-mining
operation of the nature described in subdivision (2) of this
subsection where: (A) After consultation with the appropriate
land use planning agencies, if any, the proposed post-mining
land use is deemed considered to constitute an equal or better
economic or public use of the affected land, as compared with
premining use; (B) the applicant presents specific plans for
the proposed post-mining land use and appropriate assurances that
the use will be: (i) Compatible with adjacent land uses; (ii)
obtainable according to data regarding expected need and market;
(iii) assured of investment in necessary public facilities; (ii)
(iv) practicable with respect to achieving the proposed use;
(iii) (v) supported by commitments from public agencies where
appropriate; (iv) (vi) practicable with respect to private
financial capability for completion of the proposed use; (v)
(vii) planned pursuant to a schedule attached to the reclamation
plan so as to integrate the mining operation and reclamation with
the post-mining land use; and (vi) (viii) designed by a person
approved by the director registered professional engineer in conformance with professional standards established to assure the
stability, drainage and configuration necessary for the intended
use of the site; (C) the proposed use would be compatible with
adjacent land uses, and existing state and local land use plans
and programs; (D) the director provides the county commission of
the county in which the land is located and any state or federal
agency which the director, in his or her discretion, determines
to have an interest in the proposed use, an opportunity of not
more than sixty days to review and comment on the proposed use;
and (E) all other requirements of this article will be met:
Provided, That, as used in this section, the term "agricultural
use" shall mean the production of food, feed, forage, fiber and
oilseed crops. In order for land to have an agricultural use it
must have the soil quality, growing season and moisture supply
needed to produce economically sustained high yields of crops
when treated and managed according to acceptable farming methods,
including water management. Before land may be approved for a
post-mining agricultural use the applicant must demonstrate that
the land will either: (i) Produce a sustained yield equal to or
greater than the average yield produced by lands in the county
where the mine is located which have not been subject to surface
mining; or (ii) produce a sustained yield of crops of a value
equal to or greater than the value of the timber or crops located on the land prior to mining. Before land may be approved for a
post-mining agricultural use the applicant must demonstrate that
the land after mining will have an adequate and dependable water
supply from precipitation or irrigation, a favorable temperature
and growing season, acceptable acidity or alkalinity, acceptable
salt and sodium content, and few or no rocks. As used in this
section, the term "public use" shall mean a use of land for the
benefit of the general public and shall include, at a minimum:
(I) Ownership of the land by an agency of the federal, state, or
local government or by a political subdivision; (II) permanent
access by such members of the general public who wish to make use
of the land; (III) active management of the land by personnel of
a federal, state or local government or by personnel of a
political subdivision; (IV) presence on the land of constructed
facilities as buildings, roads, swimming pools, or other
recreational or public facilities which are designed to enhance
the utility of the land for a public use or to enhance the
enjoyment which the public derives from that use.
(4) In granting any permit pursuant to this subsection, the
director shall require that: (A) A natural barrier be retained
to inhibit slides and erosion on permit areas where outcrop
barriers are required: Provided, That constructed barriers may
be allowed where: (i) Natural barriers do not provide adequate stability; (ii) natural barriers would result in potential future
water quality deterioration; and (iii) natural barriers would
conflict with the goal of maximum utilization of the mineral
resource: Provided, however, That, at a minimum, the constructed
barrier must be sufficient width and height to provide adequate
stability and the stability factor must equal or exceed that of
the natural outcrop barrier: Provided further, That where water
quality is paramount, the constructed barrier must be composed of
impervious material with controlled discharge points; (B) the
reclaimed area is stable; (C) the resulting plateau or rolling
contour drains inward from the outslopes except at specific
points; (D) no damage will be done to natural watercourses; (E)
spoil will be placed on the mountaintop bench as is necessary to
achieve the planned post-mining land use: And provided further,
That all excess spoil material not retained on the mountaintop
shall be placed in accordance with the provisions of subdivision
(22), subsection (b) of this section; and (F) ensure stability of
the spoil retained on the mountaintop and meet the other
requirements of this article.
(5) All permits granted under the provisions of this
subsection shall be reviewed not more than three years from the
date of issuance of the permit; unless the applicant
affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the approved schedule
and reclamation plan.
(6) No reclamation or performance bond, or any part thereof,
for any permit granted under the provisions of this subsection
shall be released until the approved post-mining land use has
been achieved.
(d) In addition to those general performance standards
required by this section, when surface-mining occurs on slopes of
twenty degrees or greater, or on such lesser slopes as may be
defined by rule after consideration of soil and climate, no
debris, abandoned or disabled equipment, spoil material or waste
mineral matter will be placed on the natural downslope below the
initial bench or mining cut: Provided, That soil or spoil
material from the initial cut of earth in a new surface-mining
operation may be placed on a limited specified area of the
downslope below the initial cut if the permittee can establish to
the satisfaction of the director that the soil or spoil will not
slide and that the other requirements of this section can still
be met.
(e) The director may promulgate rules that permit variances
from the approximate original contour requirements of this
section: Provided, That the watershed control of the area is
improved: Provided, however, That complete backfilling with spoil material is required to completely cover the highwall,
which material will maintain stability following mining and
reclamation.
(f) The director shall promulgate rules for the design,
location, construction, maintenance, operation, enlargement,
modification, removal and abandonment of new and existing coal
mine waste piles. In addition to engineering and other technical
specifications, the standards and criteria developed pursuant to
this subsection must include provisions for review and approval
of plans and specifications prior to construction, enlargement,
modification, removal or abandonment; performance of periodic
inspections during construction; issuance of certificates of
approval upon completion of construction; performance of periodic
safety inspections; and issuance of notices and orders for
required remedial or maintenance work or affirmative action:
Provided, That whenever the director finds that any coal
processing waste pile constitutes an imminent danger to human
life, he or she may, in addition to all other remedies and
without the necessity of obtaining the permission of any person
prior or present who operated or operates a pile or the
landowners involved, enter upon the premises where any such coal
processing waste pile exists and may take or order to be taken
such remedial action as may be necessary or expedient to secure the coal processing waste pile and to abate the conditions which
cause the danger to human life: Provided, however, That the cost
reasonably incurred in any remedial action taken by the director
under this subsection may be paid for initially by funds
appropriated to the division for these purposes, and the sums so
expended shall be recovered from any responsible operator or
landowner, individually or jointly, by suit initiated by the
attorney general at the request of the director. For purposes of
this subsection "operates" or "operated" means to enter upon a
coal processing waste pile, or part thereof, for the purpose of
disposing, depositing, dumping coal processing wastes thereon or
removing coal processing waste therefrom, or to employ a coal
processing waste pile for retarding the flow of or for the
impoundment of water.
NOTE: The purpose of this bill is to modify certain permit
application standards regarding affected lands; to define
"agricultural use" and "public lands"; and to require
documentation to support intended post-mining uses for affected
lands.
Strike-throughs indicate language that would be stricken
from the present law, and underscoring indicates new language
that would be added.